General Projects
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Construction of Vaduthala – Perandoor Bridge and approach road – SIA Final Report | 30/08/2019 | View (2 MB) |
| Construction of Thangalam Kakkanad four lane -Award Inquiry Notice | 02/09/2019 | View (1 MB) |
| C4-67272/15 30-05-2019 – Form 10 Publication in Gazette | 30/05/2019 | View (221 KB) |
| Construction of IIP LLC – 14623 Metre – Leading Channel to Manjaali Thodu – 4(1) notification in Form 4 | 30/08/2019 | View (66 KB) |
| Connectivity Bridge at Pizhala for Moolampilly – Pizhala Bridge and its Approaches – SIA Study report publication – Final report | 20/08/2019 | View (5 MB) |
| Connectivity Bridge at Pizhala for Moolampilly – Pizhala Bridge and its Approaches – SIA Study report publication – Draft report | 20/06/2019 | View (1 MB) |
| LA for Alunkal kadavu bridge Approch road- SIA study final report | 09/08/2019 | View (5 MB) |
| Connectivity Bridge at Pizhala for Moolampilly – Pizhala Bridge and its Approaches – Form 4 Publication | 19/03/2019 | View (93 KB) |
| Expert Committee Report- Ankamalay Sabari Rail Project Kunnathunadu Taluk-A2-101/17 of Chairman, Expert Committee | 30/07/2019 | View (106 KB) |
| LR C4-9236/19-ANGAMALY – SABARI RAILWAY LINE – NAYATHODE RAILWAY OVER BRIDGE – Approved RR Package | 11/07/2019 | View (741 KB) |