General Projects
Filter Document category wise
Title | Date | View / Download |
---|---|---|
Construction of Mulamthuruthy Railway Over Bridge – Form 10 approved | 02/02/2019 | View (137 KB) |
Angamaly -Sabari Railway Project – Acquisition of 00.0065 Hectare in Nedumbassery Village – Preliminary Notification in Form No.7 Under LARR Act 2013 Section 11(1). Approved by District Collector. | 20/10/2018 | View (203 KB) |
Angamaly -Sabari Railway Project – Acquisition of 00.2544 Hectare in Angamaly Village – and 0.6228 Hectare in Mattoor Village. Preliminary Notification in Form No.7 Under RFCTLARR Act 2013 Section 11(1). Approved by District Collector. | 28/11/2018 | View (554 KB) |
Angamaly -Sabari Railway Project – Acquisition of 00.0240 Hectare in Angamaly Village. Preliminary Notification in Form No.7 Under RFCTLARR Act 2013 Section 11(1). Approved by District Collector. | 14/01/2019 | View (193 KB) |
Angamaly -Sabari Railway Project – Acquisition of 00.0625 Hectare in Mattoor Village. Preliminary Notification in Form No.7 Under RFCTLARR Act 2013 Section 11(1). Approved by District Collector. | 14/01/2019 | View (214 KB) |
Approach road for Chettikkad Kunjithai, Kottuvallikkad Vavakkad bridges – Expert Group Report approved by the Appropriate Govt – Proceedings approved | 03/11/2018 | View (264 KB) |
Approach road for Chettikkad Kunjithai, Kottuvallikkad Vavakkad bridges – Expert Group Report – Minutes approved | 23/10/2018 | View (341 KB) |
Mulanthuruthy ROB – RR Package approved | 16/01/2019 | View (301 KB) |
Alunkal Kadavu Bridge approach road – Form 4 notification – approved | 14/01/2019 | View (55 KB) |
Valiya kadamakkudy- Chathanad Bridge – SIA Final Report | 22/12/2018 | View (6 MB) |