General Projects
Filter Document category wise
| Title | Date | View / Download |
|---|---|---|
| Construction of Keezhmurikadavu Bridge -Approach road – Form 4 Publication | 13/11/2017 | View (912 KB) |
| IIP – LCC Chainage 10490-12000 meter-SIA Study report Examination by the Appropriate Government-Proceedings Approved | 06/11/2017 | View (92 KB) |
| KSTP – LA publication to Velloorkunnam – Post Office Jn, Muvattupuzha | 24/10/2017 | View (2 MB) |
| IIP – LCC Chainage 10490-12000 meter – Expert Committee Report Publication | 25/10/2017 | View (976 KB) |
| Construction of intake well and pump house for water supply to Kakkanad industrial area – Final report | 13/03/2017 | View (1,024 KB) |
| Construction of intake well and pump house for water supply to Kakkanad industrial area – Draft report | 10/03/2017 | View (117 KB) |
| Moolampilly – Pizhala Bridge & Approach road – Form 4 Publication | 09/07/2017 | View (877 KB) |
| Manjerikkuzhi Bridge Award | 20/06/2017 | View (1 MB) |
| IIP – LCC Chainage 10490-12000 meter – SIA Study report publication – Final report | 02/05/2017 | View (488 KB) |
| IP – LCC Chainage 10490-12000 meter – SIA Study report publication – Draft report | 02/05/2017 | View (497 KB) |